Airbus A330 - Electrical

0%

If the EMER GEN TEST pb (guarded) is pressed and held:

Correct! Wrong!

What is the true statement according to these ECAM ELEC page indications?

Correct! Wrong!

What is the true statement according to this ECAM ELEC page?

Correct! Wrong!

According to the information below:

Correct! Wrong!

The main function of the MAINT BUS switch is:

Correct! Wrong!

As shown on this ECAM ELEC page, the ESS TR is normally supplied by:

Correct! Wrong!

On ground, when only ground services are required, external power can supply the AC and DC GND/FLT buses directly, without supplying the aircraft's entire network. This configuration is selected via the MAINT BUS switch, located in the cockpit.

Correct! Wrong!

This configuration is selected via the MAINT BUS switch, located in the forward entrance area. This switch allows maintenance and ground service personnel to energize electrical circuits for ground servicing, without energizing the aircraft's entire electrical system.

One of ECMU's function is:

Correct! Wrong!

In case of main generators loss, the emergency generator automatically supplies DC power to the aircraft electrical system.

Correct! Wrong!

The emergency generator automatically supplies AC power to the aircraft electrical system.

What does this "ELEC TR 2 FAULT" message indicate?

Correct! Wrong!

Advertisement

What does this red FAULT light indicate?

Correct! Wrong!

According to these indications which AC BUS supplies the ESS TR?

Correct! Wrong!

Engine GEN 1 supplies power to:

Correct! Wrong!

When ECAM shows " ELEC ECMU 1 FAULT ":

Correct! Wrong!

The EMER GEN is being powered by a hydraulic system pressurized by an engine driven hydraulic pump. Pressing the LAND RECOVERY p/b switch will:

Correct! Wrong!

The Emergency generator is powered by:

Correct! Wrong!

According to this ECAM ELEC page

Correct! Wrong!

What does this "ELEC GEN 2 FAULT" message indicate?

Correct! Wrong!

An engine generator is driven:

Correct! Wrong!

What does this "ELEC DC BUS 2 FAULT" message indicate?

Correct! Wrong!

Advertisement

With APU GEN and External Power supplying the network:

Correct! Wrong!

The MAINT BUS switch is located:

Correct! Wrong!

On the C/B ECAM page, the flight crew reads "NORMAL". What does it mean?

Correct! Wrong!

According to this ECAM ELEC page:

Correct! Wrong!

The minimum number of generators required to supply all the network is:

Correct! Wrong!

On ground, the inverter is activated, if only the batteries are supplying electrical power to the aircraft, and both BAT 1 and BAT 2 pushbuttons are on.

Correct! Wrong!

Two main Transformer Rectifiers TR1 and TR2 and one essential TR supply the aircraft’s electrical system with DC current. A fourth TR is dedicated to APU start or APU battery charging.

Correct! Wrong!

Each TR controls its contactor by internal logic.

Either the APU generator or external power may supply the complete system (with some galley shedding in case of overload).

Correct! Wrong!

Emergency generator deactivation occurs only automatically in flight at slats extension. If powered by the RAT only (both engines are lost) it can be reactivated _____.

Correct! Wrong!

On the ground it can be after both engines shutdown.

Loss of one generator or TR provide (except if lost is due to overcurrent detection):

Correct! Wrong!

Advertisement

In flight, APU not running, an engine generator has failed. What is supplying the corresponding AC BUS?

Correct! Wrong!

When the MAINT BUS switch is on:

Correct! Wrong!

What does this ELEC BAT 1 FAULT " message indicate?

Correct! Wrong!

The APU battery:

Correct! Wrong!

Two Electrical Contactor Management Units (ECMU) provide:

Correct! Wrong!

When the LAND RECOVERY pb-sw is pressed in EMER ELEC configuration, ADR 3 is lost, and consequently:

Correct! Wrong!

Airbus A330 – Electrical